We have been busy at this house lately finishing our basement. It’s mostly been Aj and our little helper Lincoln. The drywall got put up this last week and there is one coat of mud on. The rest of the mudding and texturing will all be done this week so we will be ready to paint next weekend! We are looking forward to spending lots of time downstairs!

This is looking at the bar and walkout to the left and where the big 120in. screen will be!

1-19-13 002

Here is the main living area as we walk down the steps. That back area is Lincoln’s play room and then bathroom and two bedrooms are back there too.

1-19-13 003

Bathroom

1-19-13 006

Here’s inside one of the bedrooms. The right is hallway and another bedroom on the other side.